2002

Acquisition of NEC Brazil's memory division

2005

Construction of the semiconductor factory in Atibaia/SP

2006

Start of the semiconductor encapsulation process in Brazil

2007

Expansion of the semiconductor factory in Atibaia/SP

2011

Two companies in Brazil: semiconductor encapsulation and memory modules (PADIS and Brazilia Informatics Law)

2014

Expansion of the semiconductor factory (10,000 m²) in Atibaia/SP: 1st class 10 clean room in Latin America

2016

Creation of the R&D line dedicated to encapsulation/testing at Instituto Eldorado, in Campinas/SP

2017

Expansion of the semiconductor factory in Atibaia/SP

2020

Start of production of LoRaWAN® communication modules for the Internet of Things (IoT)

2021

Start of production of DRAM, SSD, and IoT memory modules at Zilia da Amazônia: first factory in Manaus/AM